lusMizo tawng

Case 1: Manual picking burden tih tlem .

 

page-1000-666

Client hi global machinery siamtu a ni a, high-pressure plunger pump leh hydraulic components lama tui tak a ni a, ram leh bial 190 chuangah hralh chhuah a ni. Production capacity a san chhoh zel avangin manual picking workload tihtlem leh warehouse turnover efficiency tihchangtlun a ngai nghal hle.

Harsatna .

• Material te chu hun rei tak chhung chu leiah an dah a, chu chuan low space utilization leh distributed inventory a thlen a ni.

• SKU 3,000 chuang chu warehouse pumpuiah operator 20 chuang chuan kut hmangin an la a, order te te, batch te te an nei bawk.

02
01

thil siam chhuah te .

• 4 Double-Pallet stacker crane thuk tak tak a awm.

• Conveyor system inzawmkhawm .

• Software suite: WCS / WCS / API / ECS .

• Stacker crane te tan custom racking system hman a ni.

 

03
Hlawkpuina

He project hian double-deep stacker crane pali chu conveyor system nena paired a ni a, chu chuan component chi hrang hrang 3,000 vel a dah theih a ni-traditional floor storage aiin a let 9 velin a sang zawk. A hmasa ber-floor production area chu a pahnihna-floor picking area nen a inzawm a, chutah chuan .Deliecn 100 a ni.Pallet Stacker Crane hian thil siam chu second-Floor picking station-ah direct-in thil a lift thei a, chu chu thil atan-mi pakhat picking-ah a ni. Staffing chu 20 atanga 6 ah tihhniam a ni a, overall operational efficiency chu 40% in a pung a, labor intensity pawh nasa takin a tlahniam bawk.

 

 

Inquiry thawn rawh .